Site visit and survey
We visit the property and look at everything, the structure, walls, floors, roof, damp, electrics, plumbing, heating and drainage. We’ll ask how you want to live in the home and which rooms matter most to you.
If we spot anything that needs attention, like old wiring, lead pipes, rotten joists or damp, we’ll tell you there and then so it’s in the plan from day one.
Your written quote
You’ll get a clear itemised quote room by room showing what’s included, what isn’t, who supplies each item and how long the work will take. Nothing extra is ever added without your approval in writing.
Planning and approvals
We plan the programme, order materials and arrange skips, parking and access. If structural work is involved we work with a structural engineer and make sure Building Control approval is in place before work starts.
Strip out
We protect anything that’s staying, like original floors, staircases or fireplaces, then strip the property back and take all the waste away.
Structural work
New openings, steel beams sitting on padstones, joist repairs and any damp treatment. Temporary supports called acrows hold everything safely in place while the steels go in.
First fix
New electrics, plumbing, heating pipework, data cables and ventilation ducting run through the walls, floors and ceilings while everything is open. Building Control and our electrician check the work before it’s covered up.
Plastering and screed
Walls and ceilings are boarded and skimmed and floors are screeded or levelled, ready for underfloor heating, tiles or wood. New plaster needs time to dry properly before decorating so we plan this into the programme.
Kitchens and bathrooms
Units fitted, bathrooms tanked and tiled, sanitaryware and worktops installed.
Second fix
Sockets, switches, lights, radiators, boiler commissioning, internal doors, skirting and architraves all go in.
Decoration, flooring and handover
Painting, final floor finishes and a deep clean. Then we walk round every room with you and check every detail together before we sign off. You’ll receive your electrical and gas certificates, your Building Control completion certificate where needed and your 10 year warranty in writing.