Planning and approvals
Drawings, planning and approvals. What you need and how we help?
Every extension needs proper drawings and approval before any work starts. This is the part most homeowners worry about, so we take care of it for you from start to finish. Here’s exactly what’s needed at each stage and what we do for you.
1
Measured survey and architectural drawings
What’s needed: A measured survey of your house and garden and a full set of drawings showing the existing and proposed floor plans, elevations, sections and site plan. The council, Building Control and the structural engineer all work from these drawings.
How we help: We arrange the survey and the architect and make sure the drawings show exactly what you want and exactly what we’ll build.
2
Structural calculations
What’s needed: A structural engineer designs the foundations, steel beams, padstones, lintels and roof structure and provides calculations for Building Control.
How we help: We work with the engineer so the design is safe, practical to build and good value.
3
Planning permission, prior approval or a Lawful Development Certificate
What’s needed: Before work starts your extension needs approval from the council in one of three ways.
- Lawful Development Certificate: For single storey rear extensions built under permitted development rights, up to 3 metres deep on terraced and semi detached houses or 4 metres on detached houses, no higher than 4 metres and no higher than 3 metres at the eaves within 2 metres of a boundary.
- Prior approval: For larger single storey rear extensions up to 6 metres on terraced and semi detached houses or 8 metres on detached houses. The council writes to your neighbours and usually decides within 42 days.
- Full planning permission: Usually needed for side return, wraparound and double storey extensions, homes in conservation areas, listed buildings, flats and maisonettes. Councils usually decide within 8 weeks.
How we help: We tell you which route your extension needs, prepare the application with the architect, submit it to the council and deal with any questions from the planning officer.
4
Building Regulations approval
What’s needed: Every extension needs Building Regulations approval through a full plans application or a building notice. Building Control inspects the foundations, drainage, damp proofing, structure and insulation as the work goes on and issues a completion certificate at the end.
How we help: We submit the application, book every inspection and hand you the completion certificate when your extension is finished.
5
Party Wall notices
What’s needed: Under the Party Wall etc. Act 1996 you must serve notice on your neighbours at least one month before digging foundations within 3 metres of their foundations, and at least two months before building on or cutting into a party wall.
How we help: We help you prepare the notices, talk to your neighbours and work with the party wall surveyor if one is needed.
6
Thames Water build over agreement
What’s needed: If your extension will be built over or within 3 metres of a public sewer you’ll need a build over agreement from Thames Water before work starts.
How we help: We check the sewer records and run a drain survey where needed, then help you apply and protect the drains during the build.