Shell and Core Explained: What You’re Actually Buying in a Commercial Unit
In short
Shell and core is the condition in which a commercial building or unit is handed over with its structure, external envelope, common areas and main shared services complete, but with the internal space left bare. The tenant or buyer then carries out the fit out needed to use it.
Shell and core describes what a landlord or developer actually delivers before a tenant moves in. It is common for new office buildings, retail units in new developments and ground floor commercial space under new flats across London. Understanding exactly what is included matters, because the gap between shell and core and a space you can use is often large and has to be paid for by the tenant.
What shell and core usually includes
- Structure: frame, floors, roof and stairs.
- External envelope: walls, cladding, glazing and roof finishes, making the building weathertight.
- Common areas: entrance, reception, lifts, stair cores and shared toilets in multi tenant buildings.
- Main services: incoming utilities and risers, sometimes main plant, with supplies capped off at the unit.
- Fire safety: the building’s main fire strategy, escape stairs and core compartmentation.
What it usually does not include
- Internal finishes: ceilings, floor finishes, wall finishes and partitions.
- Distribution of heating, cooling, ventilation, lighting and power across the space.
- Toilets and kitchens within the unit, in many retail and restaurant units.
- Shopfront, signage, extraction and specialist equipment.
The exact split varies from building to building, so the specification in the lease or sale contract is what counts.
Shell and core vs Cat A and Cat B
For offices, there are three common stages. Shell and core is the bare building. Cat A adds a basic usable finish: ceilings, lighting, raised floors and services. Cat B is the tenant’s own fit out with rooms, furniture and branding. Our guide to Cat A vs Cat B fit out explains the difference. Some landlords also offer a warm shell with basic services added.
What to check before you sign
- The landlord’s specification: what is delivered and to what standard.
- Service capacity: power, water, drainage, gas and extraction routes for your use.
- Planning use class and any change of use needed.
- Landlord approvals and rules for your fit out works.
- Reinstatement obligations at the end of the lease, which can lead to dilapidations claims.
- Rent free periods or capital contributions to help with fit out costs.
Budgeting for the fit out
The fit out of a shell and core unit can cost far more than tenants expect, particularly for restaurants and cafés that need extraction, drainage and upgraded power. A survey and itemised fit out price before you commit to the lease is the best way to avoid surprises and to negotiate a fair contribution from the landlord.
How we handle shell and core units on London’s Prestige projects
We survey the unit against the landlord’s specification, flag gaps in services or approvals early, and give you a clear, itemised price to take the space from shell to ready to trade. One project manager coordinates landlord approvals, building control and the fit out programme. Learn about our commercial fit out service and our fit out approach, then book a site visit to assess your unit.
Common questions
Is a shell and core unit cheaper to rent?
Rent may be lower or come with a rent free period, but the tenant pays for the fit out, which can be a significant cost. Compare the total cost, including fit out and any landlord contribution, against a unit that is already fitted.
Who pays to fit out a shell and core unit?
Usually the tenant or buyer pays. Landlords sometimes contribute through a capital contribution or a rent free period, especially in new developments or for long leases. Negotiate this before you sign the lease, with an itemised fit out price in hand.
What is the difference between shell and core and warm shell?
Shell and core is the bare building with capped services. A warm shell usually adds some basics, such as finished floors, a ceiling, lighting or toilets, so the tenant has less to do. Definitions vary, so check the specification.