What Does a Fit Out Contractor Do?

In short

A fit out contractor makes the interior of a building ready to use. They build partitions and ceilings, install services, floors and finishes, and coordinate the trades needed to turn an empty shell or an existing space into a working office, shop, restaurant or home.

A fit out contractor takes an interior from bare or tired to finished and working. In commercial property, that might mean turning a new shell unit into a restaurant, upgrading a dated office floor for a new tenant, or adapting a shop for a new brand. The fit out contractor coordinates the trades, manages the programme and hands over a space that is ready to trade or occupy. Our guide to commercial fit out covers the process in more detail.

What a fit out contractor does

  • Pre construction: surveys, pricing, programme, buildability advice and landlord approvals.
  • Strip out: removing old fittings, partitions and services.
  • Internal construction: partitions, ceilings, raised floors, doors, joinery and acoustic treatment.
  • Services: coordinating M&E work such as power, lighting, heating, cooling, ventilation, data, fire alarms and plumbing.
  • Finishes: flooring, decoration, tiling, washrooms, kitchens and tea points.
  • Compliance: fire safety, means of escape, compartmentation, accessibility and building control.
  • Handover: testing, commissioning, snagging and operation and maintenance manuals.

Cat A and Cat B fit outs

Office fit outs are usually described as Cat A or Cat B. Cat A is the landlord’s basic finish: ceilings, lighting, raised floors, toilets and core services. Cat B is the tenant’s own fit out: meeting rooms, kitchens, branding, furniture and IT. A fit out contractor may deliver either or both, often starting from a shell and core building.

Fit out contractor vs general builder

A general builder focuses on structure and building work. A fit out contractor specialises in interiors, working within existing buildings, often occupied ones, with tight programmes, landlord rules, out of hours working and close coordination with tenants’ IT and furniture suppliers. On a design and build fit out, the contractor also takes responsibility for the design.

Choosing a fit out contractor

  • Relevant projects and references in similar spaces.
  • A clear, itemised price with exclusions stated.
  • Experience with landlord approvals and building control on commercial jobs.
  • A realistic programme and a named project manager.
  • Proper insurances and health and safety procedures.

Working with landlords and building managers

Commercial fit outs often take place in buildings with other tenants and a managing agent. The fit out contractor usually submits method statements, risk assessments and drawings for landlord approval, books goods lifts and loading bays, follows building rules on noise and working hours, and arranges permits for hot works or fire alarm isolation. Handling this well keeps the project moving and the landlord relationship positive.

How we handle fit outs on London’s Prestige projects

We manage commercial fit outs from survey to handover with one point of contact, work around trading hours and building rules, and keep landlords, building control and your own suppliers informed. You receive a clear programme, regular progress updates and a complete handover pack. Learn about our commercial refurbishment and fit out service and book a site visit to discuss your space.

Common questions

Do I need a fit out contractor or an architect first?

For simple projects, a design and build fit out contractor can handle both design and construction. For larger or more complex spaces, an architect or interior designer often prepares the design first and a fit out contractor prices and builds it.

Can a fit out happen while my business stays open?

Often, yes. Good fit out contractors phase work, use out of hours working for noisy tasks and keep fire routes and access clear so you can keep trading. It needs careful planning with the contractor before work starts.

How long does a commercial fit out take?

It depends on the size, specification and approvals needed. A small office or shop can take a few weeks; a large floor or restaurant may take several months. Lead times on equipment and landlord approvals often drive the programme.