Completed project · Bathroom renovation · Hampstead
A complete bathroom renovation for a Hampstead home. Stripped back to the walls and rebuilt with a walk in shower, floor to ceiling marble effect porcelain and matt black brassware. Planned, built and finished by one London team, with one point of contact from the first site visit to handover.
★★★★★ 5.0 on GoogleFully insuredOne team, start to finish
Parliament Hill · NW3 · Completed
The approach
The room gets its daylight through a full height obscured glazed screen. The design works with that light rather than against it. Pale, veined porcelain runs across the walls and floor, so the room reads as one continuous surface and feels larger than its footprint.
Black was used with discipline. The shower screen frame, the brassware, the mirror and the glazing bars all share the same matt black, which gives the room a clean architectural line without clutter.
A single fixed screen keeps the shower open and easy to step into, with nothing to slide or catch.
A wall hung WC with a concealed cistern keeps pipework out of sight and the floor quick to clean.
A textured stone effect mosaic wall behind the basin adds depth without competing with the rest of the room.
Project photographs
Photographed on completion. Every image on this page is of this Parliament Hill bathroom, built by our own team.




Schedule of finishes
Scope of works
No separate plumber, electrician and tiler to coordinate. We managed every trade and every stage of this bathroom, in the right order.
Floors and access routes protected. The old bathroom removed and waste cleared from site.
New supply and waste runs, concealed valve and WC frame set out before a tile goes on.
Downlights, extractor and any power positions wired to the agreed layout.
Walls boarded and levelled. The shower area waterproofed before tiling.
Large format porcelain set out and laid with straight lines and tight, consistent joints.
Sanitaryware, brassware, glass and lighting fitted, then snagged together before handover.
How we manage a bathroom renovation
The part homeowners worry about most is not the tiles. It is the disruption, the communication and whether the job finishes as agreed. This is how we run it.
We see the room, check access and existing services, and talk through how you want the bathroom to work.
A clear, itemised quotation. What is included, what is not, and who supplies what, agreed before we start.
Sanitaryware, brassware and tiles confirmed and ordered, so the build is not held up waiting for materials.
Protection, strip out, first fix, waterproofing, tiling and second fix, carried out in sequence by our own team.
One point of contact throughout. You know what is happening this week and when we need a decision from you.
We walk the finished room with you and resolve any points before we sign it off.
Client reviews
★★★★★ 5.0 rating on Google
“We recently had our bathroom completely renovated by London’s Prestige Ltd and the results are outstanding. The tiling, shower enclosure, brass fixtures and overall finish have transformed our bathroom space.”Andi Ibra · Bathroom renovation · Google review
“What I appreciate most is their reliability, clear communication, and the professional way every project is managed from start to finish.”Betim Dushaj · Google review
“The team was professional throughout and responded to our questions promptly and clearly.”TJ O’Sullivan · Google review
Planning a bathroom in NW3 or nearby?
Send us your postcode and a few photos of the existing room. We will call you back, talk through what you have in mind and arrange a site visit if it is the right fit.
More completed bathrooms
FAQs
Can’t see your question? Call 020 3576 7307 or message us on WhatsApp.
It depends on the size of the room, whether the layout changes, the condition of what is behind the walls and floor, and the tiles, sanitaryware and brassware you choose. A complete renovation like this one involves strip out, new plumbing and electrics, waterproofing, tiling and fitting, so it is priced as a full project, not a refit.
After a site visit we give you an itemised written quotation, so you can see exactly where the budget goes before anything is agreed.
Timescales depend on the scope, any layout or structural changes, and lead times on materials. We confirm a realistic programme with you after the site visit, and we order key items before work starts so the build is not left waiting on deliveries.
We manage the whole bathroom: protection, strip out, plumbing, electrics, preparation, waterproofing, tiling, fitting and decoration. You deal with one team and one point of contact, not a plumber, an electrician and a tiler working to different schedules.
In most bathrooms, yes. We check the waste route, the floor construction and the water pressure at the site visit, then recommend the right tray or level access option and screen for the space.
Yes. Where a designer or architect is involved, we build to their drawings and specification and coordinate with them on site. If you do not have a designer, we can talk through layout, finishes and practical options with you.
Either. We can source and supply items within the agreed scope, or fit items you have chosen yourself. Who supplies what is set out clearly in the written proposal before work begins, so there are no gaps or surprises.
Floors and routes through the property are protected before strip out, dust is controlled, and the site is left tidy at the end of each day. Clients regularly mention in reviews how clean the team kept their home.
We are based in West Hampstead and work across London, including Hampstead, Belsize Park, Highgate, St John’s Wood, Primrose Hill, Kentish Town, Camden, Maida Vale and West Hampstead. Send us your postcode if your area is not listed.
Tell us your postcode and what you have in mind. We will come and see the room, then give you a clear written quotation.
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |
WhatsApp us